Knowledge Base  /  Disaster Recovery  /  SafeHaven 4
Knowledge Base  /  Disaster Recovery  /  SafeHaven 4

SafeHaven-4-Edit Checkpoint Period

Updated by Anshul Arora on Nov 29, 2016

Steps to enable periodic checkpoints

  • Right click on the Protection Group and then click “Edit Checkpoint Period” from the drop-down menu.

    Create Checkpoint

  • Enable Periodic Checkpoints by checking “Checkpoints enabled” option.

  • Enter a value, which can be as low as 30 seconds, for the checkpoint period and then click on "OK".

    Create Checkpoint